Those who have sought changes to the submitted plan or plan revisions and have indicated that they would like to speak must be invited to the hearings. Inspectors will also ensure that everyone is dealt with fairly in matters such as the timely circulation of papers and reasonable notice in advance of hearings. However, to assist participants and ensure consistency in approach, examinations will usually be undertaken within the parameters set out in this guidance.
5.5 The hearings programme will be intensive and focussed. If this is not possible, any parties represented by a team or a group sharing the same views will be asked to nominate a lead speaker. All contributors to the discussion should be set a place at the table. 5.2 the source for this reference The nature and location of the hearing sessions is a matter for the LPA and Inspector to determine (via the PO). The emphasis will be on informality, with the Inspector leading a debate on the matters set out in the agenda.
All representations and counter‑representations will be analysed by the Local Development Plan Team, after which a Public Consultation Report will be prepared and presented to Elected Members for consideration. The strategy, policies and allocations are realistic and appropriate having considered the relevant alternatives and are founded on a robust evidence base. Has the plan had regard to other relevant plans, policies and strategies relating to the Council’s district or to any adjoining Council’s district? Has the DPD been subject to sustainability appraisal including Strategic Environmental Assessment?
The role of the programme officer is to provide administrative support to the examination. The Planning Inspectorate provides ‘advisory visits’ which LPAs are encouraged to request during plan preparation. The Planning Inspectorate takes its data protection responsibilities for the information you provide us with very seriously. The Planning Inspectorate also produces a model representation form for local plans which is available for use by LPAs at the publication (Regulation 19) stage of consultation.
5.34 A practical problem can occur if the PO is released from post at the end of the hearings as there will be no direct channel of communication with the Inspector. 5.32 At the closing hearing session the Inspector will check to ensure that all identified ‘action points’ have been completed or are well underway. Where it would assist the examination process, the Inspector may also invite written comments from certain parties on a proposed IC.
If straightforward, uncontentious plan revisions are proposed or the number of hearing sessions / participants is likely to be limited, the Inspector may decide that a PHM is not necessary. As a PHM is a public meeting, simultaneous translation should always be provided. The examination website and all documents produced by the Inspector (including Guidance Notes for Participants, Action Points, and any correspondence with the LPA) must also be published in both Welsh and English concurrently. However, the fact that the parties may agree on certain issues will not prevent the Inspector probing those issues further if necessary.
6.6 If a Plan is found sound subject to changes, the Inspector’s report will identify binding recommendations. 6.5 Where focussed changes were made to the plan in advance of submission the Inspector will clarify the status of these early in the report. 5.35 There may be occasions where an Inspector identifies a flaw late on in the examination process, or there is some substantive change which could affect the plan (e.g. national policy is altered).
The Government’s planning policies relating to local plans can be found in the National Planning Policy Framework (NPPF) and further information is provided in Planning Practice Guidance. Local authorities wanting more information about how the hearing stages will take place should contact the local plans team at The fees are set out in the Town and Country Planning (Costs of Independent Examinations) (Standard Daily Amount) (England) Regulations 2006. In most cases the report will recommend some changes that are necessary to allow the plan to be adopted. In most cases the examination will include hearing sessions which are held in public. The four tests of soundness are set out in the National Planning Policy Framework (NPPF).
Other parties may also be invited to attend if the Inspector considers that they would assist in their understanding of the issues in question. Hearing sessions will be inquisitorial, with the Inspector probing relevant issues. The Inspector’s role is not to improve the Plan but to make recommendations to ensure it is sound. The role of the appointed Inspector is to carry out an independent assessment of the overall soundness of the plan and to ensure that it satisfies the statutory requirements for its preparation.